Charger Oaks High School

A HIGH PROFILE FLOOR SYSTEM

The Charger Oaks High School in California wanted to upgrade their old, gym floor and required a high profile floor system with leveling flexibility to accommodate an uneven subfloor.
 
Junckers 2-layer batten system DuoBat 120+ worked perfectly for this purpose. The system can be installed with a profile span of 120 – 242mm and levelling is easily done by using Junckers adjustable and locking wedge system, totally without use of nails and tools.
 
1000 m² of Junckers solid hardwood SylvaSport Beech Premium were installed in this gym.
Get contacted

Choose the look of the wooden floor:

Healthy flooring

Junckers floors and woodcare
carry the Danish Indoor Climate label

Wellbeing

Underfloor heating

Elegant solution and design freedom
without pipes and heaters

More information 

How to install

The clip-, glue-, or batten system
- which do you prefere?

Installation methods

Try the Junckers Carbon Calculator

Find the most environmentally
friendly flooring solution

Compare footprint 

Green credentials

EPDs, accreditation towards DGNB, LEED
and BREEAM, ISO 14001 + 50001 certified

More information 

Responsible forestry

Junckers floors are chain of custody
certified through FSC® and PEFC™

Certified timber 

 
keyboard_arrow_up



picture_as_pdf