Arcadia High School

A PERFECT SOLUTION FOR A COMPLEX TASK

Arcadia High School’s gym renovation was publicly funded from the Los Angeles Union School District.  Upon inspecting the existing 40 year old floor, one could see that the uneven 152 to 178mm sub floor construction really was a challenge for the existing floor.  Additionally, there was a newly added on floor system to the old gym floor with a construction height of only 102mm.  This created the necessity to have two floor systems used beneath one large gym floor area. 

The perfect solution proved to be Junckers 2-layer batten solution DuoBAT 120+ with possible construction height from 120-245mm and Junckers 1-layer batten solution UnoBAT 62+ with possible construction height from 62-214mm.

1800 m² of Junckers solid hardwood SylvaSport Beech Premium were installed in this gym and the fact that the hardwood floor was lacquered from the factory enabled a quick turnaround time, so the school could reopen quickly

Get contacted

Choose the look of the wooden floor:

Healthy flooring

Junckers floors and woodcare
carry the Danish Indoor Climate label

Wellbeing

Underfloor heating

Elegant solution and design freedom
without pipes and heaters

More information 

How to install

The clip-, glue-, or batten system
- which do you prefere?

Installation methods

Try the Junckers Carbon Calculator

Find the most environmentally
friendly flooring solution

Compare footprint 

Green credentials

EPDs, accreditation towards DGNB, LEED
and BREEAM, ISO 14001 + 50001 certified

More information 

Responsible forestry

Junckers floors are chain of custody
certified through FSC® and PEFC™

Certified timber 

 
keyboard_arrow_up



picture_as_pdf